Tulumayo 4

Location

Hydroelectric plant located in Junin, south central Peru, 2.080 meters above sea level.

LAP’s Capacity

47,8 MW

In preparation

Construction to start: 1H 2017

Hydroelectric plant located in Junin, south central Peru, 2.080 meters above sea level. With a gross head of approximately 277 meters and 2 Vertical Francis turbines, guarantee total capacity 56.2 MW (47.8 MW Power LAP) connecting the tower 8 of Runatullo transmission line 3 – Design by a transmission line of 8 km and voltage of 220 kV. The project meets the environmental licensing approved and is waiting to obtain PPA to start construction.