La Cabaña

Location

This is the first greenfield wind project to be developed by LAP from the beginning. It is located in the Ninth Region, near Angol.

LAP’s Capacity

110,4 MW

Under development

Construction to start: 2H 2017

This is the first greenfield wind project to be developed by LAP from the beginning. It is located in the Ninth Region, near Angol. The project is under preparation for start construction. The basic engineering of the park and interconnection system are concluded, the studies are entered into the system of environmental assessment. The start of construction is estimated for the second half of 2017 and will have a total capacity of 110.4 MW guaranteed by the introduction of 32 Vestas V117, with 91.5 meters in height and diameter of 117 meters. The interconnection system provides a line of 30 km connecting to the substation Mulchen. The project meets the environmental licensing admitted to the evaluation system acclimate dated obtaining the RCA scheduled for the first half of 2016.