Projects

In operation since dec/2016

San Juan

This wind farm began development in 2012 after more than 5 years of wind measurements.

view project

Operating since february 2016

Carilafquén and Malalcahuello

They are the first hydroelectric projects developed entirely by LAP in Chile.

view project

In operation since February 2009

Santa Cruz 1

This is a hydroelectric plant located at Ancash, northeast of Lima, at 2,125 meters above sea level.

view project

In operation since January 2010

Totoral

This wind farm is located at Canela, in the Fourth Region, 295 kilometers north of Santiago.

view project

In operation since May 2010

Santa Cruz 2

This is a hydroelectric plant located at Ancash, northeast of Lima, upstream from Santa Cruz 1 at 2,225 meters above sea level, in the Rio Blanco river basin (Santa Cruz).

view project

In operation since January 2012

Huasahuasi 1

This is a hydroelectric plant located in Junin, between the mountains and amazon jungle of Peru, in the central Andes, at 2,550 meters above sea level.

view project

In operation since April 2012

Huasahuasi 2

This run-of-the-river hydroelectric plant is located downstream of Huasahuasi 1, at 2,360 meters above sea level.

view project

In operation since August 2014

Runatullo 3

This is a hydroelectric plant located downstream of Runatullo 2 at 2,810 meters above sea level.

view project

In operation since December 2014

Runatullo 2

This is a hydroelectric plant located in Junin, at 3,147 meters above sea level.

view project

Under Construction

Under Development

Under development

SAN JUAN 2

San Juan 2 has a total capacity of 48.3 MW. Currently, the project is under development counting with more than 7 years of wind measurements.

view project

Construction to start: 2H 2017

Capiri

Hydroelectric power station located downstream of Limacpunco 1,230 meters above sea level.

view project

Construction to start: 1H 2017

Tulumayo 4

With a gross head of approximately 277 meters and 2 Vertical Francis turbines, guarantee total capacity 56.2 MW

view project

Construction to start: 1H 2017

Tulumayo 5

Hydroelectric power station located downstream of Tulumayo 4, 1.744 meters above sea level.

view project

Construction to start: 2H 2017

Limacpunco

This hydroelectric plant is part of Araza hydroelectric complex, which will be developed near the province of Cusco

view project

Construction to start: 2H 2017

Ttio

With a gross head of approximately 319 meters and 3 Pelton turbines, ensure the capacity of 80 MW (68 MW Power LAP)

view project

Construction to start: 2H 2017

La Cabaña

This is the first greenfield wind project to be developed by LAP from the beginning. It is located in the Ninth Region, near Angol.

view project

Construction to start: 1H 2018

Pirita

It is the first solar project develop by LAP from scratch. It is located in the Coquimbo Region, near La Serena.

view project

“Capacidad LAP corresponde a la capacidad instalada total multiplicada por el porcentaje de participación de LAP”